Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| eld103-2026-001 [2026/05/01 06:13] – [Thursday April 29 2026] smickster | eld103-2026-001 [2026/05/02 06:58] (current) – removed smickster | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ==== Friday April 24 2026 ==== | ||
| - | * Unloaded cleaning cart and vacuum to bring into building | ||
| - | * Vacuumed lobby floor and carpets | ||
| - | * Vacuumed extensively lobby perimeter, elevator threshold, entrance threshold | ||
| - | * used brush on some corners to dislodge debris from baseboard | ||
| - | * Wiped entryway window glass interior and exterior | ||
| - | * brushed and wiped exterior door trim dust, cobwebs etc | ||
| - | * discarded trash from mailbox mini can | ||
| - | * vacuumed up ramp to industrial door | ||
| - | * vacuumed threshold to stairwell | ||
| - | * Vacuumed elevator | ||
| - | * Vacuumed 4th floor elevator threshold | ||
| - | * Vacuumed partial fourth floor hallway (battery drained) | ||
| - | * Stowed cart in janitor closet on fourth floor | ||
| - | * Discussion with James, swapped encoded keyfob, discussed logistics and first day work | ||
| - | |||
| - | ==== Tuesday April 29 2026 ==== | ||
| - | |||
| - | * Vacuumed Lobby perimeter | ||
| - | * Vacuumed 1st floor stairwell up to second floor | ||
| - | * Vacuumed landing second floor and half way to thirt floor | ||
| - | * Vacuumed window area on second floor stairwell along trim, pipes etc up to about 9ft high | ||
| - | * Vacuumed 2nd floor hallway, seating area perimeter and down to emergency exits including home thresholds | ||
| - | * Vacuumed elevator and elevator track, dislodged some debris from elevator perimeter | ||
| - | * took away junk mail from mini trash can in lobby | ||
| - | * Vacuumed lobby front entrance threshold and above door removing *some* cobwebs | ||
| - | |||
| - | ==== Thursday April 29 2026 ==== | ||
| - | |||
| - | * Assembled dedicated vacuum for onsite storage and use | ||
| - | * tested janitor closet dump sink | ||
| - | * Extensive 4th floor vacuuming including: | ||
| - | * Perimeter, thresholds upper sills, elevator landing area | ||
| - | * back hallway area (dark) used attachment to get debris off surface | ||
| - | * hallway window sill and above window (cobwebs on latches) | ||
| - | * stairwell landing and a couple steps above and below | ||
| - | * Atrium overlook - concrete relief cuts & lodged debris around pillars and railings | ||
| - | * beneath and around display bicycle | ||
| - | * scraped small goo spot | ||
| - | * Vacuumed lobby carpet | ||
| - | * Vacuumed front door threshold interior & exterior | ||
| - | * Vacuumed parking garage carpet extensively | ||
| - | * Rubber broomed carpet to dislodge lots of fur and lint | ||
| - | * Vacuumed area surrounding elevator threshold | ||
| - | * Vacuumed elevator track at basement dislodging gross old debris | ||